Construction A Smith is a Montreal contractor specializing in kitchen renovations. We handle the entire project from design to completion.

What is included in our kitchen renovation service?
Our general contractor service manages all trades for your kitchen remodel.

  • Plumbing and electrical hookups
  • Installation of cabinets and countertops
  • Flooring and tiling
  • Lighting fixture installation
  • Appliance installation and setup

How long does a kitchen renovation take in Montreal?
The timeline for a kitchen renovation depends on the project scope. A typical full kitchen remodel takes between 4 to 8 weeks. This includes:

  • Week 1-2: Demolition and rough-in (electrical/plumbing)
  • Week 3-5: Installation (drywall, cabinets, flooring)
  • Week 6-8: Finishing (countertops, painting, final touches)

How much does a kitchen remodel cost in Quebec?
Kitchen renovation costs vary based on size and materials. Contact us for a free detailed quote. Our pricing is transparent with no hidden fees.

Construction A Smith
Phone:
514 709 7937
Email: [email protected]